COMMERCIAL EV CHARGINGPerth

Commercial EV Charging Perth

Perth and regional WA

We install commercial EV charging for Perth businesses, as a licensed electrical contractor. Designed around what your site can already carry, so the supply rarely has to grow, with load management on every job that needs it.

A fleet of electric vans charging from individual chargers at a Perth depot
EC11686
Electrical contractor
2 yrs
Parts and labour
10+
Years in EV charging

We look before we quote

A site visit decides the design, not a phone call

Itemised proposal

Costs, timeline and warranty, line by line

Licensed, EC11686

Certificate of Electrical Safety on completion

Supported here

Ocular and Exploren, both run from Perth

Commercial EV charger installation, first call to handover.

The build

Installation runs 2 weeks to 2 months, depending on the product and the site.

  1. 01

    Enquiry and site visit

    Power availability, charger type, use case and the infrastructure already there.

  2. 02

    Design and proposal

    Options against your goals and budget. Itemised, with warranty and service tier.

  3. 03

    Installation

    Licensed and compliant, with a Certificate of Electrical Safety on completion.

  4. 04

    Commissioning

    Tested, documented, and your team trained on the software before we leave.

Commercial switchboard and load management controller in a Perth facility

EV load management for commercial sites.

Load management

Most sites are short of control, not power. Chargers that share the supply keep the site inside its limit, and the vehicles still leave full.

$0

Spent on a supply upgrade you did not need

How it works

Fleet and depot EV charging: the whole yard leaves full.

Overnight

Bays charge in turn through the night, so the supply never has to grow to match the fleet.

6pm

6am

  • Bay 01

  • Bay 02

  • Bay 03

  • Bay 04

  • Bay 05

  • Bay 06

  • Bay 07

  • Bay 08

Eight charging bays filling one after another between early evening and early morning, drawing in turn rather than all at once.

Sized against your run sheet, commissioned and handed over with 2 years on parts and labour.

Commercial EV charging sites running today.

Projects

All projects

Midway Ford

DealershipMidlandOcular commercial EV chargers
Commercial EV charging at a dealership site in Perth
  • Commercial EV charging at a dealership site in Perth
  • Commercial EV charging at a dealership site in Perth

A dealership has a charging problem most sites do not: the vehicles being charged are not the staff's, they are stock and customer handovers, and they have to be ready on the hour they are promised.

Ocular commercial chargers were installed to support the incoming e-Transit and EMAC range, so the dealership can prepare vehicles for delivery and support customers after it.

Read the full job

Step4

WorkplaceCanning ValeOcular IQ Wallbox 7kW with Exploren software
Commercial EV charging at a workplace site in Perth
  • Commercial EV charging at a workplace site in Perth
  • Commercial EV charging at a workplace site in Perth

Step4's staff used electric vehicles for work, which left the business balancing the cost of public charging against the difficulty of reimbursing home charging fairly. Other providers had quoted over four thousand dollars.

The answer was two parts. Workplace charging for the hours the vehicles were on site, and a software enabled portable charger with its own SIM connectivity, RFID authentication and automatic session recording for the hours they were not.

Every session logs the start and finish time, the energy consumed and the user, so home charging can be reimbursed on evidence instead of an estimate. The result was lower installation cost, less spend on public charging, and more flexibility for staff.

Read the full job

St John Ambulance

Emergency fleetPerthOcular DC fast charger
Commercial EV charging at a emergency fleet site in Perth
  • Commercial EV charging at a emergency fleet site in Perth
  • Commercial EV charging at a emergency fleet site in Perth

An emergency fleet is the clearest case for DC there is. A vehicle that has just come back has to be able to go out again, and an eight hour charge is not an option at any price.

DC fast charging was installed at the depot so turnaround is measured in the time it takes to change over, not the time it takes to charge.

Read the full job

EV charger support and servicing in Perth.

After the install

2 years on parts and labour, then a response time you choose.

  • Bronze

    Standard support and remote diagnostics.

  • Silver

    Priority response ahead of the standard queue.

  • Gold

    Guaranteed response times, written into the agreement.

EV charger installation across Perth and regional WA.

Where we work

Perth metro and regional Western Australia.

Every suburb below has its own page on the supply, the sites and the charging pattern we meet there. Start with where we install commercial EV charging across Perth.

Book a commercial EV charging site assessment.

Next step

We assess your supply, your vehicles and your timeline, then put an itemised proposal in front of you with the costs and the warranty in writing.

Office
Unit 2/77 Forsyth Street, O'Connor WA 6163
Licence
EC11686

Book a site assessment

No obligation. We look before we quote.

Quick check

Quick check

Loading icons…

We use your details to respond to this enquiry and nothing else.

Call usSite assessment